Work Status:

Preliminary layout is done.  Spread is contained within shoulders.  

Engineering Review Needed on:

I am confident in the hydraulic numbers (I know HEC-22 pretty well), I do not have confidence in the validity of the engineering or placement assumptions I've made.  Examples:

   Where spillways are used, are the physical characteristics appropriate: local depression, cross-slope, capacity limits, bypass assumptions, etc.

 

Remaining Work to be Performed:

see the To Do Page

Design was performed in InRoads Storm&Sanitary!

S&S makes extensive use of 3D Digital Terrain Models, in InRoads format.  CAiCE-generated surfaces vary in level of detail (20-meter sections tend not to provide enough information).  I the primary design surface is used was santafe_KC_breaklines.dtm, which came from CAiCE surface limits (kudos to Israel for a good model!).  

Based on profiles, there are a number of inlet grates that need to be adjusted vertically; the elevation uncertainties don't alter the validity of the horizontal locations.

Assumptions:

 

Red Flags:

 



The files in the P:/11-23580/Users/Jeff folder were created by Jeff Martin of CH2MHill
For problems or questions regarding this data contact info@civilxlr8.com.